What Started as an Unused Space is Now a Secure 26-Cycle Community Hub

What Started as an Unused Space is Now a Secure 26-Cycle Community Hub

Some projects are about far more than simply installing cycle parking.

They’re about solving challenges, transforming spaces, and creating infrastructure that delivers genuine long-term community benefit.

Our recent project at Clare Mount Specialist Sports College in Moreton is a perfect example.

Working as part of the wider Active Wirral initiative, the vision was to rejuvenate an underused external area into a proposed community cycling hub and café space — creating a secure, practical and welcoming environment that encourages active travel for both the school and wider local community.

Cycle-In were proud to be appointed to design, manufacture and install a bespoke secure timber-clad cycle shelter for 26 bicycles.

Project Specification

8 metres (W) x 3 metres (D) x 2.1 metres (H) Secure gated access with digital locking 26 internal cycle parking spaces Fully bespoke design, manufacture and installation

Every Great Project Starts with a Challenge

Looking at the finished installation, it’s easy to assume this was a straightforward shelter install.

It wasn’t.

The original area was heavily constrained, underused, and completely unsuitable for immediate installation.

One of the first major considerations was access.

The shelter needed to connect naturally with the proposed new garden/community area, while ensuring activity behind the installation zone remained unaffected.

That required a bespoke solution.

Working with the wider project team, a section of the existing brick boundary wall and fencing was carefully adapted to create a dedicated entrance route directly into the new secure cycle hub.

That single design decision transformed how the entire space could function.

Building the Right Foundations

Before our installation team could begin, the site required a full enabling works package.

Working in collaboration with Oxton Property Maintenance, the transformation included:

✔ Site clearance and excavation ✔ Boundary wall alterations ✔ Access route creation ✔ Hardcore formation works ✔ Edge restraint installation ✔ Bespoke reinforced concrete slab construction

This phase completely transformed the usability of the area — turning an awkward external space into a purpose-prepared infrastructure footprint.

Bespoke Design. Manufacture. Installation.

Once the groundwork was complete, Cycle-In took over.

The shelter was:

Designed in-house Manufactured to bespoke project dimensions Delivered to site Installed over a 3-day programme

The finished structure combines robust commercial-grade steel fabrication with warm timber cladding, creating a secure but visually sympathetic solution that complements the wider regeneration project.

Features include:

  • secure mesh gated access
  • digital coded entry
  • integrated internal cycle parking
  • weather protection
  • robust commercial durability
  • timber-clad architectural finish

 

This wasn’t an off-the-shelf shelter.

It was a fully bespoke infrastructure solution designed specifically for Clare Mount’s vision.

More Than Just Bike Storage

Projects like this are never simply about storing bicycles.

They’re about enabling behaviour change.

They help:

Encourage active travel Promote healthier lifestyles Improve educational facilities Regenerate underused outdoor spaces Create safer, inclusive community infrastructure

Done properly, infrastructure becomes part of a wider social impact story.

Feedback That Makes It All Worthwhile

We’re incredibly proud to share feedback from Clare Mount’s Head Teacher:

“Cycle-In Logistics Ltd are an amazing company. David is easy to contact, gives excellent advice and the final bike shed installed looks amazing.”

“Every detail was covered quickly and efficiently, from plans to risk assessments, to being flexible when we had to delay the start.”

“I would highly recommend Cycle-In Logistics Ltd and use them again at Clare Mount.”

“They clearly have great values as a company and want to make a difference to local communities by helping to get them more active.”

Feedback like this means everything to our team.

Looking to Deliver Your Own Active Travel Project?

Whether you’re delivering infrastructure for:

Schools Workplaces Healthcare estates Residential developments Local authorities Community organisations

Cycle-In designs, manufactures and installs bespoke commercial cycle storage solutions across the UK.

Because better spaces create better habits.

#CycleInfrastructure #ActiveTravel #CycleShelters #CommercialCycleStorage #SchoolProjects #CommunityProjects #SustainableTransport #UrbanRegeneration #WirralBusiness #ActiveWirral #CycleParking #BespokeManufacturing #CommunityImpact #CycleIn

Back to blog